代表性论文成果
[1] Zhaoyang Lu, Qiang Meng *. Effects of asymmetric investment cost information on revenue- compensated build-operate-transfer highway contracts [J]. Transportation Research Part B: Methodological, 2023, 172: 71-92.
[2] Zhaoyang Lu, Tianyi Xing, Yanfeng Li. Optimization of electric bus vehicle scheduling and charging strategies under time-of-use electricity price [J]. Transportation Research Part E: Logistics and Transportation Review, 2025, 196:104021.
[3] Zhaoyang Lu, Yanfeng Li, Dajie Zuo. Period-dependent pricing methods of multi-type vehicles for BOT highway projects with pavement rehabilitation effects [J]. Transport Policy, 2024, 150: 84-98.
[4] Qiang Meng, Zhaoyang Lu*. Quantitative analyses of highway franchising under build-operate-transfer scheme: Critical review and future research directions [J]. Transportation Research Part B: Methodological, 2017, 102: 105-123.
[5] Zhaoyang Lu, Qiang Meng*. Impacts of Pavement Deterioration and Maintenance Cost on Pareto-efficient Contracts for Highway Franchising[J]. Transportation Research Part E: Logistics and Transportation Review, 2018, 113: 1-21.
[6] Zhaoyang Lu, Qiang Meng*. Analysis of optimal BOT highway capacity and economic toll adjustment provisions under traffic demand uncertainty [J]. Transportation Research Part E: Logistics and Transportation Review, 2017, 100: 17-37.
[7] 卢朝阳, 罗楠, 李妍峰. 携带医疗资源的多时间窗家庭医护人员调度问题研究[J]. 系统工程理论与实践, 2023, 6:1765-1781.
[8] Zhaoyang Lu, Liujiang Kang. Ship domain-based traffic capacity of Singapore Strait [J]. Journal of Navigation, 2025, Accepted.
[9] Zhaoyang Lu, Qiang Meng*. Gabriel Gomes. Estimating link travel time functions for heterogeneous traffic flows on freeways [J]. Journal of Advanced Transportation, 2016, 50: 1683-1698.
[10] Zhaoyang Lu, Kang Liujiang, Qiang Meng. Determination of minimum distance to obstacle avoidance in the Singapore strait [J], Transportation Research Record, 2018, 2672: 73-80.
