个人信息Personal Information
出生日期:1966-02-05
入职时间:2021-05-19
学历:博士研究生毕业
学位:工学博士学位
性别:男
在职信息:在岗
毕业院校:明尼苏达
所在单位:计算机与人工智能学院
研究方向
资源调度(作业、机器和人力)
1. “Nurse Rostering Problems – A Bibliographic Survey”, B. Cheang, H. Li, A. Lim, B. Rodrigues, European Journal of Operational Research, Invited Review, Volume 151, No 3 (2003 December), 447-460.
2. “A Hybrid Framework for Over-Constrained Generalized Resource Project Scheduling Problems”, A. Lim, B. Rodrigues, R. Thangarajoo, F. Xiao, Artificial Intelligence Review, June 2004, Volume 22, Issue 3, 211-243.
3. “Minimizing Total Flow Time in Single Machine Environment with Release Time: An Experimental Analysis”, Y Guo, A. Lim, B. Rodrigues, S. Yu, Computers and Industrial Engineering, Volume 47, Issues 2-3, Pages 123-140 (November 2004).
4. “Two Machine Flow Shop Problems with a Single Server,” A. Lim, B. Rodrigues, C. Wang, Journal of Scheduling (2006) 9, 515-543.
5. “Manpower Allocation with Time Windows and Job Teaming Constraints”, Y. Li, A. Lim and B. Rodrigues, Naval Research Logistics, Volume 52 (4), June 2005, 302-311.
6. “A Local Search Using Solution Fragments for the 2-Machine Biciteria Scheduling Problem,” G. Huang, A. Lim, B. Rodrigues, Computational Optimization and Applications, Volume 37, Issue 2 (June 2007) Pages: 219 – 229.
7. “Minimizing The Makespan of Unrelated Parallel Machines,” Y. Guo, A. Lim, B. Rodrigues and L. Yang, International Journal on Artificial Intelligence Tools, Vol. 16, No. 3 (2007) 399-415.
8. “Machine Scheduling Performance with Maintenance and Failure,” A. Lim, B. Rodrigues, S. Yu, Mathematical and Computer Modelling, Vol 45 (2007) 1067-1080.
9. “An Effective Local Search Method to solve the Flexible Demand Assignment Problem,” F. Wang, A. Lim, IEEE Transactions on Automation Science and Engineering, Volume 5, Issue 2, April 2008 Page(s):289 - 297
10. “Searching Optimal Re-sequencing and Feature Assignment on an Automated Assembly Line,” A. Lim and Z. Xu, Journal of the Operations Research Society, 60, 2009, 361-371.
11. “Load Balancing in Project Assignment,” Z. Liang, S. Guo, Y. Li, and A. Lim, Computers and Operations Research, Volume 37, Issue 12, December 2010, Pages 2248-2256.
12. “New Concepts for Activity Float in Resource Constrained Project Management,” A. Lim, H. Ma, B. Rodrigues, S. Tan, F. Xiao, Computers and Operations Research, Volume 38, Issue 6, June 2011, Pages 917-930.
13. “New Meta-heuristics for the Resource-Constrained Project Scheduling Problem,” A. Lim, H. Ma, B. Rodrigues, S. Tan, F. Xiao, Flexible Services and Manufacturing Journal, June 2013, Volume 25, Issue 1-2, pp 48-73.
14. "Branch-and-Price-and-Cut for the Manpower Routing Problem with Synchronization Constraints", Z. Luo, H. Qin, W. Zhu, A. Lim, Naval Research Logistics, volume 63 (2), March 2016, 138-171.
15. "An Enhanced Branch-and-bound Algorithm for the Talent Scheduling Problem", Hu. Qin, Z. Zhang, A. Lim, X. Liang, European Journal of Operational Research, Volume 250, Issue 2, 16 April 2016, Pages 412–426.
16. “A branch-and-price algorithm for scheduling of deteriorating jobs and flexible periodic maintenance on a single machine,” T. Wang, R. Baldacci, A. Lim, Q. Hu, European Journal of Operational Research, Volume 271, Issue 3, 16 December 2018, Pages 826-838.
17. “Mitigating overtime risk in tactical surgical scheduling”, Y. Zhang, Y. Wang, J. Tang, A. Lim, Omega, Volume 93, June 2020, 102024.
18. “Machine scheduling with orientation selection and two-dimensional packing for additive manufacturing,” K. Hu, Y. Che, Zhenzhen Zhang, A. Lim, Computers and Operations Research, Volume 130: 105245 (2021).
19. “Lower Bounds and Heuristics for Unit-Capacity Resource constrained Project Scheduling Problem with Transfer Times,” Y. Liu, J. Zhou, A. Lim, and Q. Hu, Computers and Industrial Engineering, 161: 107605 (2021)
20. “A Tree Search Heuristic for the Resource Constrained Project Scheduling Problem with Transfer Time”, Y Liu, J Zhou, A Lim, Q Hu, European Journal of Operational Research, 304(3) 939-951 (2023).
21. “Problems and solution methods of machine scheduling in semiconductor manufacturing operations: A survey”, J Fang, B Cheang, A Lim, Sustainability 15 (17), 13012 (2023).

